As announced by the Minister of Energy and Water H.E. Mr. César Abi Khalil, the call for Expression of Interest (EOI) for the construction of 4 new wind farms with a total capacity of 200-400 MW is already online. Interested private sector entities are requested to submit their EOI’s by 12 April 2018. The call for EOI can be downloaded using the following link: http://bit.ly/Wind2ndRnd.